What to expect when hiring metal roof coating companies is a fairly standard sequence: a site survey and written specification, cleaning and repair of the existing sheets, treatment of cut edges, laps and fixings, the coating system itself, and finally an inspection and a guarantee. If the contractor does it properly, your building stays in use the whole time. This guide covers each stage so you know what a good contractor should be doing, and what to question if they skip it.
Key facts
- Coating is a refurbishment of your existing profiled metal roof, not a new roof. You avoid strip-out, so cost and downtime are lower than replacement.
- Our systems are cold-applied with no hot works. Warehouses, factories and schools can keep operating underneath.
- Preparation decides how long the coating lasts. Cleaning, rust treatment and cut edge repair matter as much as the coating.
- A proper quote is written and itemised. It should be based on a physical survey, not a satellite image.
- We offer guarantees of up to 25 years on our coating systems, depending on the system and the condition of the roof.
Stage 1: The first conversation
Have some basic information ready before you call. It speeds things up. Useful details include:
- the approximate roof area and building type, for example distribution warehouse, production unit or school block
- the roof’s age, if you know it
- where any leaks or visible rust are
- your operating hours and any areas that cannot be disrupted, such as food production zones, loading bays or classrooms
- site access arrangements
A contractor who quotes a firm price at this point, without seeing the roof, is guessing.
Stage 2: The roof survey
The survey is where a contractor shows whether they know metal roofs. On a profiled or corrugated metal roof we look at:
- Cut edges: the exposed sheet ends at the eaves and laps, where the factory coating peels back and rust starts
- Side and end laps: failed sealant and lap corrosion are common sources of leaks
- Fixings: rusted, loose or missing fasteners and perished washers
- Rooflights: their condition and how they meet the metal sheets
- Gutters: standing water, joint failures and corrosion, especially on box gutters
- The existing coating: whether it is chalking, flaking or delaminating, and whether the substrate is still sound enough to coat
Not every roof is suitable for coating. If sheets are perforated or structurally failing, a sensible contractor will say so. They may recommend replacing individual sheets before coating the rest. An honest survey sometimes means a smaller job.
Stage 3: The written specification and quote
A good quote reads like a method statement. It should state:
- the areas being treated
- the cleaning and preparation method
- the repairs included
- the named coating system, primer and number of coats
- access and safety arrangements
- the guarantee being offered and what it depends on
On metal roofs we commonly specify Delcote 25. Where gutters need lining, we use Plygene. Both are supplied by HD Sharman.
When you compare metal roof coating companies, put the specifications side by side, not only the totals. A cheaper quote usually means less preparation, fewer coats or no cut edge work. Those are the parts that decide whether the roof lasts.
Stage 4: Planning around your operations
The system is cold-applied, with no strip-out and no hot works. That means no gas torches above stock or staff, and the building stays weathertight because the existing roof stays in place throughout.
Planning should still cover:
- access routes and any ground-level exclusion zones
- vehicle movements around loading areas
- working times, if noise or activity on the roof is a concern
Coatings need suitable weather to apply and cure. Expect your contractor to plan around forecasts rather than push on in rain or very low temperatures.
Stage 5: Preparation and repairs
This is the least visible stage and the most important one. Typically it involves:
- cleaning the roof thoroughly to remove dirt, moss and loose material
- removing flaking coating and loose rust
- treating corroded areas
- replacing or sealing fixings
- resealing laps
Cut edge corrosion treatment is a separate task within this stage. The corroded edges are cleaned back, primed and sealed before the main coating goes on. If a contractor plans to coat over active cut edge rust without treating it, the problem will come back through the new finish.
Stage 6: Application
With the substrate prepared, the primer and coating system are applied to the manufacturer’s requirements. This includes the specified film thickness and the drying time between coats.
Gutters, rooflight upstands and other details are usually treated alongside the main roof area so the whole roof is protected as one system.
Stage 7: Inspection, handover and guarantee
At the end, the work should be inspected and photographed, and the guarantee issued in writing. Guarantees usually depend on sensible upkeep, such as keeping gutters clear and reporting damage. Ask what the conditions are before work starts, not after.
What to expect when hiring metal roof coating companies: FAQs
Do we need to close the building while the roof is coated?
Normally, no. Because the coating goes over the existing roof and is cold-applied, operations usually carry on underneath. Any restrictions are mainly at ground level around access points.
How long does a metal roof coating project take?
It depends on roof size, condition, the amount of repair needed and the weather. A contractor should give you a programme after the survey. Be wary of any fixed timescale offered before anyone has been on the roof.
How much does it cost?
We can’t give a reliable figure without a survey. Area, access, condition and the specification all change the price. What we can say is that coating avoids the strip-out, disposal and downtime that come with replacement, which is why many owners choose it.
Do you only work in East Anglia?
No. We are based in Swaffham, Norfolk, and carry out commercial roof coating across the UK. Response is quickest in Norfolk, Suffolk, Cambridgeshire and Essex.
Book a metal roof survey
If your warehouse, factory or commercial roof is showing rust, leaks or a failing coating, we’ll survey it and give you a clear written specification. Call us on 01760 613186, email info@stormcoatings.co.uk or request a quote online.